Bound To Stay Bound

View Book Details

001 2024934170 040286
003IlJaBTS
00520260327083711.0
008240312s2024 waua b b 000 0 eng
010 a| 2024934170
020 a|9781632173065 (trade)
020 a|1632173069 (trade)
040 a|DLC
b|eng
c|IlJaBTS
d|IlJaBTS
043 a|n-us-wa
082 4a|624.1
2|23/eng/20260106
1001 a|Abler, Amanda.
245a|Big Bertha :
b|how a massive tunnel boring machine dug a highway under Seattle /
c|Amanda Abler ; illustrated by Katy Wu.
260 a|Seattle :
b|Sasquatch Books,
c|2024.
300 a|[48] p. :
b|col. ill. ;
c|25 cm
504 a|Includes bibliographical reference.
5103 a|Booklist starred, September 01, 2024
520 a|A nonfiction picture book about the drill that made the longest and widest tunnel in North America underneath Seattle.
5211 a|007-010
b|BTSB.
650 7a|Construction equipment.
2|sears
650 7a|Roads
x|Design and construction.
2|sears
650 7a|Tunneling.
2|sears
650 1a|Construction equipment.
650 1a|Roads
x|Design and construction.
650 1a|Tunneling.
651 7a|Seattle (Wash.)
2|sears
651 1a|Seattle (Wash.)
7001 a|Wu, Katy,
e|ill.


View Book Details
Loading...